Sep 29, 2014: Pre-Conference with CMII-Tutorial - From CM to CMII/IPE for Executives

The Pre-Conference gives a brief overview of the CMII model for Configuration Management. It is an ideal introduction into CMII.

icm-logo.jpgCMII is about changing faster and documenting better. It is about accommodating change and keeping requirements clear, concise and valid. This one-day tutorial will quantify the resources being spent on corrective action. It will identify the root causes and provide the CMII solutions.

This tutorial describes how physical item hierarchies can be used to break end-item products down into their most manageable increments and how a closed-loop change process is used to process changes and upgrade requirements.

It will describe how to categorize changes and process at least 75% of the total on a fast-track basis, the major cost drivers for changes and how those costs can be minimized.

Finally, it will describe the potential for using one common change process throughout the entire organization.

Language: English

Instructor: Carol Cotty - CMII Trainer, ConfigOnline - CMII South Africa

08:30 - 09:00 Registration and welcome coffee
09:00 - 13:00 Introduction to CMII
  1. An organization runs on requirements
  2. Corrective Action: Causes and Solutions
  3. Needed Solutions Reside in the CM Domain
  4. Physical Item Hierarchies and Linkages
13:00 - 14:00 Lunch break
14:00 - 18:00 CMII Baselines and CMII Change Process
  1. Product Development and Baselines
  2. Project Management: Two Cycles, not One
  3. Closed-Loop & Fast-Track Change Process
  4. About CMII/IPE Enabling Software Tools
18:00 End of Pre-Conference - Free evening on your own
top